Our Expertise

Our Capabilities

BIM for
Construction Stage

A model created for design is not always suitable for construction. Site teams need clear, coordinated information that reflects actual installation conditions. When that information is missing or unclear, decisions get made on site that could have been resolved earlier.

Construction Models Clash Resolution Site Sequencing Revit + Navisworks

What We Do

Models built for
how things get built.

We develop and adjust models so they can be used during construction. This includes refining layouts, resolving clashes, and ensuring systems can be installed as shown in the model.

01

Model Refinement for Construction

Design models are reviewed and updated to reflect construction conditions. Elements are positioned and detailed to a level that can be handed directly to site teams without further interpretation.

02

Clash Resolution

Conflicts between systems are identified and resolved before work begins on site. Each clash is worked through and confirmed in the model so nothing is left open for site teams to figure out.

03

Contractor Input Integration

Where contractors provide feedback on installation requirements or site constraints, we incorporate that input into the model so it reflects how the work will actually be carried out.

How We Work

Practical considerations, built in from the start.

Site Conditions Considered

We account for physical site constraints when positioning elements in the model. Clearances, structural penetrations, and access routes are checked against what is actually feasible on site.

Installation Sequencing

Model content is reviewed in the context of how systems will be installed. Where sequencing affects layout decisions, those requirements are factored in before the model is issued.

Coordination Updates

As coordination progresses, models are updated to reflect agreed outcomes. Resolved items are confirmed in the model so the issued version always represents the current coordination status.

Accessibility and Maintenance Space

Space for maintenance access and equipment removal is checked within the model. If clearances are insufficient, adjustments are made before the layout is finalised.

Outcome

What you receive at the end.

Start a Project

Send us your drawings.
We will review the scope.

Our Expertise Get in Touch